100% cashless ready — tap card, Apple Pay & Google Pay on every machine

Free 60-second audit

The Off-Site Break Cost Calculator

How much are off-site coffee and snack runs really costing your business? Move the sliders below to calculate your hidden wage overhead — and see what you recover with a $0 COST on-site machine.

The short answer

Every off-site coffee run is paid working time. A 40-person site where staff make three 15-minute coffee runs and two 12-minute snack runs a week burns well over $100,000 in wages across 48 working weeks. An on-site machine costs you nothing but electricity — roughly $145 to $420 a year — and keeps staff inside the gate during breaks.

Your site

People who would use the machine

Coffee runs

Cafe trips your team makes off site

Door to door, including queueing

What staff pay out of pocket off site

Snack & drink runs

Shop trips for food and cold drinks

Door to door, including queueing

Loaded cost per working hour

Combo ~2.0, ambient snack ~0.5

Indicative commercial rate

Calculated over 48 working weeks. Indicative only — actual results depend on your site.

What off-site breaks cost you

Lost per week
$2,070
Lost per month
$8,280
Lost per year
$99,360
Hours lost to coffee runs
1,440 hrs
Hours lost to snack & drink runs
768 hrs
Wages paid during coffee runs
$64,800
Wages paid during snack runs
$34,560
Staff out-of-pocket cafe spend
$31,680
Electricity cost (your only cost)
$241
Net annual benefit of an on-site machine
$99,119

Beyond lost wages: the WHS and workers' comp exposure

Australian workers' compensation schemes treat morning tea and lunch as an authorised recess. If a staff member leaves your premises for coffee or takeaway during that break and is injured — a footpath slip or a traffic incident — the injury can be lodged as a workplace claim. Claims history feeds directly into your premium, and a single claim can affect renewals for several years. Confirm how your state scheme and insurer treat recess claims for your site.

Workplace team taking a short on-site coffee and snack break beside a vending machine and bean-to-cup coffee unit
On-site breaks keep staff inside the gate — no travel time, no footpath risk.

Share this result

The link below reopens the calculator with your exact figures — send it to your manager, finance team or an HR blog.

Preview

Off-Site Break Cost Calculator — 40 staff, $99,360 lost a year

A 40-person site loses about $99,360 a year in paid time on off-site coffee and snack runs. Net benefit of an on-site $0 COST machine: $99,119 a year. Calculated with the Off-Site Break Cost Calculator: https://machinesvending.com.au/roi-calculator?staff=40&ct=3&cm=15&st=2&sm=12&cs=5.5&w=45&kwh=2&r=0.33

https://machinesvending.com.au/roi-calculator?staff=40&ct=3&cm=15&st=2&sm=12&cs=5.5&w=45&kwh=2&r=0.33

Get these numbers for your site — $0 COST hire

No purchase, no lease, no rental fee. Tell us about your site and we'll confirm which machine you qualify for, what it will stock and when we can install it — usually within a few working days.

  • Your business name and site address (suburb and state) so we can match a local operator
  • How many staff, students or visitors are on site each day
  • What you'd like stocked — snacks, cold drinks, healthy options, coffee, PPE or a mix
  • Best contact name, mobile and email for confirming install times

We'll come back to you with machine availability and an install date. There is no cost, no lock-in contract and no obligation. Prefer to talk? Call 0401 NO COST (0401 662 678) — nationwide Australia.

Download your results as a PDF

A one-page summary of your inputs, lost-wage figures and net annual benefit — ready to send to your manager, finance team or WHS committee.

Submit the enquiry form above to unlock your PDF summary

Risk mitigation & WHS

Why Australian workplaces are stopping off-site coffee & snack runs

Off-site breaks don't just drain productivity — they expose Australian employers to workers' compensation claims and multi-year premium increases that on-site refreshments avoid entirely.

Authorised break liability

In major Australian jurisdictions, lunch and morning tea are treated as an authorised recess. If an employee leaves your gate for coffee or food and is injured, it can be lodged as a workers' compensation claim — subject to the circumstances and your state scheme.

Multi-year premium impact

Workers' compensation premiums are experience-rated against your claims history. A single off-site slip or driving incident during a coffee run can influence your premium at renewal for several years, not just the year of the claim.

100% on-site risk elimination

Cafe-quality coffee, fresh food and cold drinks on site keep staff inside your premises during breaks — removing public road and footpath exposure while recovering hundreds of working hours a year.

General information only, not legal or insurance advice. Check your obligations with your insurer, broker or state regulator.

Reduce your WHS risk profile today. We deliver, install, stock and service your machine at zero cost to your business.

Check free placement eligibility in your city

Methodology, and how to cite this tool

This calculator is free to use, free to reference and free to link to. Australian HR, facilities and SME finance publications are welcome to quote the method or the figures a reader produces, provided the calculator is credited.

The formula, in full

  • Lost hours = staff on site x trips per person per week x minutes per trip x 48 working weeks, divided by 60.
  • Lost wages = lost hours x average loaded hourly wage. Coffee runs and snack runs are modelled separately, then added.
  • Running cost = machine kWh per day x your electricity rate x 365. Placement, delivery, stocking and service are $0.
  • Net annual recovery = lost wages minus running cost.
  • Weekly and monthly figures are the annual total divided by 48 and 12. Every input is user-supplied — nothing is assumed or hidden.

Indicative estimate only. Results depend on your site layout, staff behaviour and how far the nearest cafe is.

Link to the calculator

Copy either version into your article, newsletter or intranet page.

Plain URL

https://machinesvending.com.au/roi-calculator

HTML credit link

<a href="https://machinesvending.com.au/roi-calculator">Off-Site Break Cost Calculator</a> by Machines Vending

Writing about the hidden cost of the 3pm coffee run and need a comment or the raw method? Call us on 0401 662 678 or use the enquiry form above.

Off-site break cost questions

What does the Off-Site Break Cost Calculator measure?

It estimates the wages your business pays while staff walk off site for coffee and snacks, split into coffee runs and snack runs, then nets that against the machine's electricity cost. Because placement, stock and servicing are free, electricity is your only direct cost.

How is the lost wage cost calculated?

Coffee runs and snack runs are counted separately. For each, staff on site x trips per person per week x minutes per trip x 48 working weeks, converted to hours and multiplied by your average loaded hourly wage. Weekly and monthly figures are the annual total divided by 48 and 12.

What does a workplace vending machine or coffee service cost to run?

Only electricity — typically $0.40 to $1.16 per day for a refrigerated machine at an indicative rate of $0.33 per kWh. There is no purchase price, lease, rental or service fee.

Can an off-site coffee run become a workers' compensation claim?

It can. Australian workers' compensation schemes recognise injuries during an authorised recess, so an injury on a footpath or in traffic during a paid break may be claimable depending on the circumstances and the state scheme. Claims history feeds into premiums, so it is worth confirming your exposure with your insurer or broker.

Is the result a guarantee?

No. It is an indicative estimate based on the inputs you enter. Actual results depend on your site layout, staff behaviour and how far the nearest cafe or shop is.

Ready for a $0 COST vending machine hire at your site?

Tell us your location, staff numbers and what your team wants stocked in a $0 COST hire vending machine of your choice, with your product choices to keep everyone happy. We'll confirm the right machine and book installation — at no cost to your business. That's how $0 COST hire works: machine sales pay for the placement and the vending service.